Technical infrastructure of Tan Cang Thanh Hoa IP

Technical infrastructure of Tan Cang Thanh Hoa IP

Tan Cang Thanh Hoa Industrial Zones is planned with comprehensive technical infrastructure to meet the production needs of supporting-industry and high-tech enterprises.

Power supply

Power comes from an independent 110 kV substation inside the park with total capacity of 189 MVA (3 x 63 MVA). Medium- and low-voltage networks are built to the connection point of every industrial plot.

Water supply and wastewater treatment

Two water sources: an on-site plant with 11,000 m³/day and the adjacent existing Mien Trung Water Plant with 15,000 m³/day. Raw water is drawn from the Bac canal system, sourced from Bai Thuong reservoir.

Phase 1: wastewater plant No. 2 with 8,700 m³/day (2 modules of 4,500 and 4,200 m³/day). Whole park: 2 plants, 12,500 m³/day in total.

Industrial park infrastructure perspective
Perspective of the road network and infrastructure of Tan Cang Thanh Hoa IP

Transportation

External roads include Thai Binh Road (8 lanes, 54 m wide) and DT2 Road (6 lanes, 40 m wide). Inside the park, the main road has 6 lanes (37 m) and branch roads 4 lanes (29 m), suited to containers and heavy trucks.

Telecom and utilities

  • Underground fibre optics throughout; 04 antenna stations, each covering 300 – 500 m
  • 4.5 m³/s pumping station with retention lake against local flooding
  • 0.99 ha parking lot with repair workshop
  • 20 ha SNP Logistics Centre; fire protection to industrial-park standards; 24/7 security