Power supply
Power is supplied from an independent 110 kV substation inside the park; medium- and low-voltage networks are built to the connection point of every industrial plot.
| Parameter | Phase 1 | Whole park |
|---|
Water supply
Two water sources: an on-site water plant and the adjacent existing Mien Trung Water Plant.
| Parameter | Phase 1 | Whole park |
|---|
Wastewater treatment
Phase 1: Plant No. 2 (KT.02, south of the park) with 8,700 m³/day in 2 modules. Whole park: 2 centralized plants, 12,500 m³/day in total.
| Parameter | Phase 1 | Whole park |
|---|
Transport
A well-planned road network suited to containers and heavy trucks, enabling smooth movement of materials and goods between factories and logistics areas.
| Parameter | Details |
|---|---|
| External roads | Thai Binh Road (8 lanes, 54 m wide); DT2 Road (6 lanes, 40 m wide) |
| Internal main road | 6 lanes, 37 m wide |
| Internal branch roads | 4 lanes, 29 m wide |
| Vehicles | Convenient for containers and heavy trucks |
| Parking | Parking lot with repair workshop, 0.99 ha |
Telecommunications
Underground fibre-optic cable throughout the park and antenna stations providing coverage for enterprises.
| Parameter | Details |
|---|---|
| Fibre optic | Underground fibre-optic cable throughout the park |
| Antenna stations | 04 stations, each covering 300 – 500 m |
Other infrastructure
Supporting utilities that ensure safe, green and efficient operations.
Green space & lakes
Improves the working environment; retention lake with a 4.5 m³/s pumping station to prevent local flooding
View details
Operations centre
Service area, warehousing and multi-function operations centre for enterprises